PaulTon:
Those 3 first dudes got fired, to be replaced with one man and his cat.
That's one big Puddy Tat. looks like a 385CL to me. 185474lbs, or 84130kg
Either way you weigh it, it still comes in at a whopping 92 1/3 metric Tonnes
Considering it comes with a 4 yard bucket, however will handle up to a 7 yard bucket, the hole is 8 yards of dirt, the actual digging would take about 30 seconds.
That is of course as stated ^
Conservation impact study $600.000.00
Dept. of Environment Protection, Permit application, review, site visit, 20 day posting in the local news paper, Immediate abutters notification, another 20 day waiting period for complaints, if none, PASS the DEP $136.000.00
Forward to conservation for EXACT same study, except, looking for 7 species of turtles, Piping Plovers, other endangered creepy crawlers as expressed above, if none, PASS
$900,000.00
Osha studying it, when they damn well get around to it. Throw it in the round file, PASS
$182,800.00
Traffic impact study, may have to widen 2 miles of existing road way to accommodate the traffic impact, 1 mile each direction. $970,000.00
Send it out to bid, post in the Dodge reports, news papers $650.00
Except lowest bid. (EXACTLY LIKE THE SPACE SHUTTLE WAS BUILT, LOWEST BIDDER, YIKES!) No wonder it blew up,,,,,,,,,,,,,,TWICE!
Check winning bidders company for correct amount of minority workers.
Pay off officials because you don't. $10,000.00
Better be union workers, or you won't get the machine on site through the picket line.
Per diem, 3 men, $1800.00
Machine of that magnitude can only be moved over the roads between 1:00am - 4:30am
machine is 3 days away. Moving and return to port fee. $16,000.00
Coordinate date of dig with local officials. Wait 3 days beyond scheduled date for same to show up. @ $5000,00 per diem rate, Machine & workers $20,400.00
Safety barriers on site, in place, and removal. $ 2800.00
Trench permit from local city. $200.00
Trenching safety equipment, over 4 feet in depth, need trench box. $800.00 per day
Machine bucket won't fit inside anyway. $800.00
PPE personal protection equipment check
OSHA responsible person on site, filing papers on every day's activities, to OSHA in D.C.
DIG, Send man to package store for ten cases of beer for the day. Minimum 8 hour day for said machine size.
Stop! Coffey break, STOP! Hit water table. Lunch break, DIG!, STOP! Hit water main, DIG Safe failed to locate, 15 minute afternoon break. Rest of day stare into hole.
STOP! Build coffer dam, hire pumps, evacuate water through hay bales, silt fence, to an acceptable area for water. Per day $86,000.00
Repair water pipe, with water crew & materials. $18,000.00
Dewater hole completely, throw corpse in hole.
This is why we are doing all this , correct?? No Charge, flip coin, see who wins.
Pull dewatering devices, back fill at 2 foot compacted lifts of dirt.
Done
Finish any left over beer. Go get more. Bullshyt 2 more hours, go home.
TOTAL $2,344,450.00 per day
This ain't my first rodeo boys, I did this around the world.